Production planning
Developed graph-based optimization algorithms for production scheduling. The problem involved expressing manufacturing tasks and their dependencies in a form suitable for scheduling.
Data and application integration
Built APIs for the production planner and data pipelines for preprocessing and feature engineering from raw plant operations data.